The extension of Line E of the Metro of Buenos Aires between Bolívar and Retiro was inaugurated in June 2019. This extension includes 2 kilometers of tunnels and three new stations: Retiro, Catalinas and Correo Central (Line E’s first interchange with Line B). For...
At the end of May 2019 the “Paseo del Bajo” was inaugurated in Buenos Aires. AC&A, together with INECO, carried out the construction supervision of Section B (partially covered South trench) of this corridor that links the North with the South of the City of...